"Supergen Life Management of Efficient

Fossil Power Plant Consortium"

Phase 2 - Work Programme

The work programme consists of 4 themes:

  • Theme 1 Advanced steam systems

  • Theme 2 Advanced gas turbines

  • Theme 3 Advanced cycles

  • Theme 4 Networking

 

Work package information:

 

Theme 1 - Steam systems

Theme 2 - Gas turbines

Theme 3 - Advanced cycles

Theme 4 - Networking

More information on each of these themes can be found using the menu on right hand side of this page.